Scaffolding was up and the formwork for the concrete slab which was to form the bathroom floor/living hall ceiling was being constructed.

View from the inside looking out

View from upstairs

Also, they've cleared much of the rubble that was on the floor inside.

But what I actually came to the house to do was to measure the hashing for the downstairs toilet bowl. For the uninitiated, you need to measure from the wall to the centre of the shitpipe. Toilet bowl also got specs, yo.
0 energy saving bulbs:
Post a Comment