Day_05: Concrete formwork

I rolled by the house today and was glad to see 3 men hard at work, with some real progress being made.
Scaffolding was up and the formwork for the concrete slab which was to form the bathroom floor/living hall ceiling was being constructed.

Photobucket

View from the inside looking out
Photobucket

View from upstairs
Photobucket

Also, they've cleared much of the rubble that was on the floor inside.
Photobucket

But what I actually came to the house to do was to measure the hashing for the downstairs toilet bowl. For the uninitiated, you need to measure from the wall to the centre of the shitpipe. Toilet bowl also got specs, yo.
Photobucket

0 energy saving bulbs:

Post a Comment