Day_06: Prep For The Pour

Dropped in the house today for a discussion with our contractor, and just to observe the men at work.

Today's big job for them is getting the rebar in place before pouring the concrete for the first floor bathroom tomorrow. The wall/floor for the extension is drilled, and the rebar inserted into the holes. The rebars are then interlinked and tied with wires.
Photobucket

The old master bath has also been totalled. It's all wide open space now.
Before and after:
Photobucket
Photobucket

Discovered another problem... the place where I wanted to relocate the master bedroom door to is obstructed by a pillar in the wall. One wouldn't usually expect to find a pillar in the middle of a wall, usually they're in the corners.
Photobucket

But on further inspection, that pillar is the continuation of the main pillar from the ground floor up. Problem highlighted in red. Nuts, I shud have realised that earlier.
Photobucket

The window on the staircase landing where the new master bath is to be build was also demolished.
Photobucket
Photobucket
Photobucket